← Back to Somerset

Solar · United Kingdom

Goldenhaye Field Solar Farm

Operator Cricket St Thomas Estate

Operational2 MWData checked 16 November 2026Source record dated 10 June 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Goldenhaye Field Solar Farm is a 2 MW solar farm 4.2 km east of Chard, Somerset, United Kingdom. Its planning application (11/01534/FUL) went to Somerset on 18 April 2011 and was granted on 9 August 2011. It has been operating since 15 April 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 41 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

284 energy sites within 40 km for Goldenhaye Field Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Cricket St Thomas Estate
Location
Cricket St Thomas, Chard, Somerset, Somerset, United Kingdom
Planning authority
Somerset
Planning application
11/01534/FUL
First operating
2013

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 11/01534/FUL, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 18 April 2011 Planning application submitted
  • 9 August 2011 Planning permission granted
  • 15 April 2013 Operational

None found. The register holds no published incident that names Goldenhaye Field Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Goldenhaye Field Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Goldenhaye Field Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Goldenhaye Field Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 10 June 2013.
Where is Goldenhaye Field Solar Farm?
4.2 km east of Chard, Somerset, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).