Solar · United Kingdom
Wambrook Farm
Operator Sunsave 19 (Wambrook)& Vogt Solar
Operational4.1 MWData checked 16 November 2026Source record dated 14 March 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Wambrook Farm is a 4.1 MW solar farm on the edge of Chard, Somerset, United Kingdom. Its planning application (14/03678/FUL) went to Somerset on 13 August 2014 and was granted on 28 November 2014. It has been operating since 15 August 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Wambrook Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 4.1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Sunsave 19 (Wambrook)& Vogt Solar
- Location
- Part Of Wambrook Farm, Weston Road, Wambrook, Chard, Somerset, Somerset, TA20 3DF, United Kingdom
- Planning authority
- Somerset
- Planning application
- 14/03678/FUL
- First operating
- 2015
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 14/03678/FUL, with what the planning evidence pack adds for this site.
Every application in Somerset · Alerts for applications and incidents near here
Timeline
- 13 August 2014 Planning application submitted
- 28 November 2014 Planning permission granted
- 15 July 2015 Construction started
- 15 August 2015 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Wambrook Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Wambrook Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Wambrook Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Wambrook Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 March 2016.
- Where is Wambrook Farm?
- On the edge of Chard, Somerset, United Kingdom (postcode TA20 3DF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).