Battery storage · United Kingdom
JB Wheaton
Operator E.ON UK
Operational8.8 MWData checked 16 November 2026Source record dated 8 August 2016
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
JB Wheaton is a 8.8 MW battery storage site 4.1 km south-east of Chard, Somerset, United Kingdom. Its planning application went to Somerset on 29 September 2014. It has been operating since 8 August 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 40 other energy sites within 10 km, 18 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when JB Wheaton changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
E.ON UK LIMITED (02366970), active, since 1989. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Co-located with RE)
- Capacity
- 8.8 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- E.ON UK
- Location
- JB Wheaton, Chard Junction, Chard, Somerset, Somerset, TA20 4QN, United Kingdom
- Planning authority
- Somerset
- First operating
- 2016
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page, with what the planning evidence pack adds for this site.
Every application in Somerset · Alerts for applications and incidents near here
Timeline
- 29 September 2014 Planning application submitted
- 8 July 2016 Construction started
- 8 August 2016 Operational
Incidents on the register at this site
None found. The register holds no published incident that names JB Wheaton. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has JB Wheaton had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names JB Wheaton; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of JB Wheaton?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 8 August 2016.
- Where is JB Wheaton?
- 4.1 km south-east of Chard, Somerset, United Kingdom (postcode TA20 4QN).