← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · New Forest

Walkford Moor Solar Farm, Walkford Lane - Solar Farm

Awaiting Construction15 MWApplication 23/11213Submitted 18 December 2023Granted 14 August 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
23/11213
Planning authority
New Forest
County or area
Hampshire
Nation
England
Technology
Solar
Capacity
15 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Boultbee Brooks (Renewables Costock) Limited
Location
Walkford Moor Solar Farm, Walkford Lane, BH25 5NH
  • 18 December 2023 Planning application submitted
  • 14 August 2024 Planning permission granted
  • 14 August 2027 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1516, Solar panels suspected in house roof fire in Ferndown, 15 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15162025Solar panels suspected in house roof fire in Ferndown15 kmSignificant
EIR-15322023Roof-space fire involving a solar inverter at a house in Ferndown16 kmSignificant
EIR-13962024Solar panel fire leads to Travelodge evacuation in Poole19 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near BH25 5NH is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in New Forest.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.