← Back to Hampshire

Energy sites / United Kingdom / Hampshire

Solar · United Kingdom

Limolands Farm Solar Array

Appeal Refused5 MWChecked 6 October 2026Last changed in the dataset 4 April 2016

Technology
Solar
Capacity
5 MW
Status
Appeal Refused
Operator or applicant
Locogen
Location
Limolands Farm, Vaggs Lane, Hordle, Lymington, Hampshire, SO41 0FP, United Kingdom
Planning authority
New Forest
Planning application
14/00817
Appeal reference
APP/B9506/W/15/3006387

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 3 October 2014 Planning application submitted
  • 17 December 2014 Planning permission refused
  • 15 May 2015 Appeal lodged
  • 30 March 2016 Appeal refused

None found. The register holds no published incident that names Limolands Farm Solar Array. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.