Solar · United Kingdom
Limolands Farm
Operator Locogen
Application Withdrawn5 MWData checked 16 November 2026Source record dated 19 September 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Limolands Farm is a 5 MW solar farm 3.6 km north-east of New Milton, Hampshire, United Kingdom. Its planning application (14/00470) went to New Forest on 11 June 2014 and was withdrawn on 15 August 2014. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 15 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Limolands Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
LOCOGEN LIMITED (SC370060), active, since 2009. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Locogen
- Location
- Limolands Farm, Vaggs Lane, Hordle, Lymington, Hampshire, SO41 0FP, United Kingdom
- Planning authority
- New Forest
- Planning application
- 14/00470
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 14/00470, with what the planning evidence pack adds for this site.
Every application in New Forest · Alerts for applications and incidents near here
Timeline
- 11 June 2014 Planning application submitted
- 15 August 2014 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Limolands Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Limolands Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Limolands Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Limolands Farm?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 19 September 2014.
- Where is Limolands Farm?
- 3.6 km north-east of New Milton, Hampshire, United Kingdom (postcode SO41 0FP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).