Solar · United Kingdom
Walkford Moor Solar Farm, Walkford Lane - Solar Farm
Operator Boultbee Brooks (Renewables Costock) Limited
Awaiting Construction15 MWData checked 16 November 2026Source record dated 23 February 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Walkford Moor Solar Farm, Walkford Lane - Solar Farm is a 15 MW solar farm in New Milton, Hampshire, United Kingdom. Its planning application (23/11213) went to New Forest on 18 December 2023 and was granted on 14 August 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 15 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Walkford Moor Solar Farm, Walkford Lane - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Walkford Moor Solar Farm, Walkford Lane - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1516, Solar panels suspected in house roof fire in Ferndown, 15 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1516 | 2025 | Solar panels suspected in house roof fire in Ferndown | 15 km | Significant |
| EIR-1532 | 2023 | Roof-space fire involving a solar inverter at a house in Ferndown | 16 km | Significant |
| EIR-1396 | 2024 | Solar panel fire leads to Travelodge evacuation in Poole | 19 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 15 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Boultbee Brooks (Renewables Costock) Limited
- Location
- Walkford Moor Solar Farm, Walkford Lane, Hampshire, BH25 5NH, United Kingdom
- Planning authority
- New Forest
- Planning application
- 23/11213
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/11213, with what the planning evidence pack adds for this site.
Every application in New Forest · Alerts for applications and incidents near here
Timeline
- 18 December 2023 Planning application submitted
- 14 August 2024 Planning permission granted
- 14 August 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Walkford Moor Solar Farm, Walkford Lane - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Walkford Moor Solar Farm, Walkford Lane - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Walkford Moor Solar Farm, Walkford Lane - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Walkford Moor Solar Farm, Walkford Lane - Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 February 2026.
- Where is Walkford Moor Solar Farm, Walkford Lane - Solar Farm?
- In New Milton, Hampshire, United Kingdom (postcode BH25 5NH).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).