Solar · United Kingdom
Hoburne Naish, Glenside Naish Estate - Solar panels
Operator Hoburne Naish Holiday Park
Application Refused0.2 MWData checked 16 November 2026Source record dated 3 March 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hoburne Naish, Glenside Naish Estate - Solar panels is a 0.2 MW solar farm in Barton on Sea, Hampshire, United Kingdom. Its planning application (23/10056) went to New Forest on 23 January 2023 and was refused on 28 February 2023. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 15 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Hoburne Naish, Glenside Naish Estate - Solar panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Hoburne Naish Holiday Park
- Location
- Hoburne Naish, Glenside Naish Estate, Christchurch Road, Hampshire, BH25 7RE, United Kingdom
- Planning authority
- New Forest
- Planning application
- 23/10056
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 23/10056, with what the planning evidence pack adds for this site.
Every application in New Forest · Alerts for applications and incidents near here
Timeline
- 23 January 2023 Planning application submitted
- 28 February 2023 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Hoburne Naish, Glenside Naish Estate - Solar panels. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Hoburne Naish, Glenside Naish Estate - Solar panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hoburne Naish, Glenside Naish Estate - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Hoburne Naish, Glenside Naish Estate - Solar panels?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 3 March 2023.
- Where is Hoburne Naish, Glenside Naish Estate - Solar panels?
- In Barton on Sea, Hampshire, United Kingdom (postcode BH25 7RE).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).