Waterditch Solar Farm

Operator New Forest Energy

Operational18 MWData checked 16 November 2026Source record dated 16 March 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Waterditch Solar Farm is a 18 MW solar farm 3.3 km north-east of Christchurch, Dorset, United Kingdom. Its planning application (8/15/0284) went to Bournemouth, Christchurch and Poole on 21 May 2015 and was granted on 24 June 2015. It has been operating since 31 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 25 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

262 energy sites within 40 km for Waterditch Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
18 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
New Forest Energy
Location
East Close Farm, Waterditch, Christchurch, Dorset, BH23, United Kingdom
Planning authority
Bournemouth, Christchurch and Poole
Planning application
8/15/0284
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 8/15/0284, with what the planning evidence pack adds for this site.

Every application in Bournemouth, Christchurch and Poole · Alerts for applications and incidents near here

  • 21 May 2015 Planning application submitted
  • 24 June 2015 Planning permission granted
  • 1 January 2016 Construction started
  • 31 March 2016 Operational

None found. The register holds no published incident that names Waterditch Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Waterditch Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Waterditch Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Waterditch Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 March 2016.
Where is Waterditch Solar Farm?
3.3 km north-east of Christchurch, Dorset, United Kingdom (postcode BH23).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).