Solar · United Kingdom

Pennington Recycling Centre

Operator Novus Solar Developments

Operational1.2 MWData checked 16 November 2026Source record dated 19 August 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Pennington Recycling Centre is a 1.2 MW solar farm on the edge of Lymington, Hampshire, United Kingdom. Its planning application (15/11012) went to New Forest on 8 July 2015 and was granted on 29 September 2015. It has been operating since 20 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 16 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 5 other sites and 296 energy sites within 40 km for Pennington Recycling Centre

Members see the sites and incidents around this one, and every record behind them.

NOVUS SOLAR DEVELOPMENTS LIMITED (08396432), active, since 2013. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Novus Solar Developments
Location
Pennington Recycling Centre, Milford Road, Pennington, Lymington, Hampshire, Hampshire, SO41 8QZ, United Kingdom
Planning authority
New Forest
Planning application
15/11012
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/11012, with what the planning evidence pack adds for this site.

Every application in New Forest · Alerts for applications and incidents near here

  • 8 July 2015 Planning application submitted
  • 29 September 2015 Planning permission granted
  • 5 January 2016 Construction started
  • 20 March 2016 Operational

None found. The register holds no published incident that names Pennington Recycling Centre. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Pennington Recycling Centre had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Pennington Recycling Centre; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Pennington Recycling Centre?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 19 August 2016.
Where is Pennington Recycling Centre?
On the edge of Lymington, Hampshire, United Kingdom (postcode SO41 8QZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).