Solar · United Kingdom

Lower Newton Farm

Operator Novus Solar Developments

Operational11.5 MWData checked 16 November 2026Source record dated 16 April 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Lower Newton Farm is a 11.5 MW solar farm 4.7 km south-west of Cheadle, Staffordshire, United Kingdom. Its planning application (SMD/2014/0197) went to Staffordshire Moorlands on 25 April 2014 and was granted on 26 August 2014. It has been operating since 31 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 29 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 5 other sites and 391 energy sites within 40 km for Lower Newton Farm

Members see the sites and incidents around this one, and every record behind them.

NOVUS SOLAR DEVELOPMENTS LIMITED (08396432), active, since 2013. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
11.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Novus Solar Developments
Location
Lower Newton Farm, Draycott Road, Tean, Stoke-On-Trent, Staffordshire, Staffordshire, ST10 4JN, United Kingdom
Planning authority
Staffordshire Moorlands
Planning application
SMD/2014/0197
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for SMD/2014/0197, with what the planning evidence pack adds for this site.

Every application in Staffordshire Moorlands · Alerts for applications and incidents near here

  • 25 April 2014 Planning application submitted
  • 26 August 2014 Planning permission granted
  • 1 November 2014 Construction started
  • 31 March 2015 Operational

None found. The register holds no published incident that names Lower Newton Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Lower Newton Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Lower Newton Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Lower Newton Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 16 April 2015.
Where is Lower Newton Farm?
4.7 km south-west of Cheadle, Staffordshire, United Kingdom (postcode ST10 4JN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).