Planning pack for this site, £295Other options

Solar · United Kingdom

Upper Leigh Solar Farm

Operator Lightrock Power

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 19 February 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Upper Leigh Solar Farm is a 49.9 MW solar farm 5 km south of Cheadle, Staffordshire, United Kingdom. Its planning application (SMD/2023/0059) went to Staffordshire Moorlands on 30 January 2023 and was granted on 2 April 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 26 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

LIGHTROCK POWER LIMITED (10927217), active, since 2017. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Upper Leigh Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1546, Solar panel isolation switch overheats in roof fire at a house in Bucknall, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall14 kmMinor
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent19 kmMinor
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire34 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Lightrock Power
Location
Lower Tean Leys, Tean Leys, Lower Tean, Staffordshire, ST10 4NS, United Kingdom
Planning authority
Staffordshire Moorlands
Planning application
SMD/2023/0059

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for SMD/2023/0059, with what the planning evidence pack adds for this site.

Every application in Staffordshire Moorlands · Alerts for applications and incidents near here

  • 30 January 2023 Planning application submitted
  • 2 April 2024 Planning permission granted

None found. The register holds no published incident that names Upper Leigh Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Upper Leigh Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Upper Leigh Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Upper Leigh Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 February 2026.
Where is Upper Leigh Solar Farm?
5 km south of Cheadle, Staffordshire, United Kingdom (postcode ST10 4NS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).