← Back to the applications
Full planning pack, £295Other options

Planning application · Solar · New Forest

New Forest Water Park, Ringwood Road - Floating Solar Panels

Application SubmittedApplication 26/10870Submitted 14 September 2026

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
26/10870
Planning authority
New Forest
County or area
Hampshire
Nation
England
Technology
Solar
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
New Forest Water Park
Location
NEW FOREST WATER PARK, RINGWOOD ROAD, SP6 2EY
  • 14 September 2026 Planning application submitted

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1964, Fire damages solar panels at Verwood farm during heatwave, 6.8 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-19642022Fire damages solar panels at Verwood farm during heatwave6.8 kmSignificant
EIR-15322023Roof-space fire involving a solar inverter at a house in Ferndown13 kmSignificant
EIR-15162025Solar panels suspected in house roof fire in Ferndown13 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near SP6 2EY is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in New Forest.

Data updated 13 November 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.