Planning application · Onshore wind · Stockton-on-Tees
Seamer Wind Farm - Hambleton
Operational4 MWApplication 09/00859/FULSubmitted 27 March 2009Granted 18 September 2009
The application
- Application number
- 09/00859/FUL
- Planning authority
- Stockton-on-Tees
- County or area
- Cleveland
- Nation
- England
- Technology
- Onshore wind
- Capacity
- 4 MW
- Status
- Operational
- Operator or applicant
- Infinis, previously Broadview Energy
- Location
- Land Adjacent Hilton Road, Seamer, Middlesbrough
- Appeal reference
- APP/G2713/A/09/2114490
- Turbines
- 2
- First operating
- 2012
Timeline
- 27 March 2009 Planning application submitted
- 18 September 2009 Planning permission granted
- 1 October 2011 Construction started
- 1 November 2012 Operational
Preview of the planning evidence pack for this site
The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1119, Wind turbine fire at Butterwick Wind Farm near Sedgefield, 21 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1119 | 2019 | Wind turbine fire at Butterwick Wind Farm near Sedgefield | 21 km | Minor |
| EIR-0863 | 2017 | Fire destroys single turbine at Knabs Ridge wind farm near Harrogate | 59 km | Significant |
| EIR-1946 | 2022 | Wind turbine fire sends black smoke across Hull | 102 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packWhat the planning evidence pack adds for this application
The pack is made for Seamer Wind Farm - Hambleton from the register and the government planning database: every comparable incident, nearest first, with its sources; the schemes refused, withdrawn or taken to appeal within 40 km, your council first; and the fire service guidance each incident bears on. One fixed, dated file, as a PDF, a web page and a Word document.
- Incidents within 50 km
- •••
- Nearest recorded incident
- ••••••
- UK grid-scale incidents, with NFCC notes
- ••••
- Schemes refused within 40 km
- •••
- Nearest refused scheme
- ••••••••••••
- Appeals within 40 km
- •••
- Decisions in Stockton-on-Tees
- ••••••••
- Sites of a similar size, worldwide
- ••••
- NFCC guidance points
- ••••••••
- Sources and citations
- ••••••••••
Launch price: £145 until 31 October (normally £295). By email in minutes. The order form arrives filled in from this application.
Alerts for applications near here
An email when another battery, solar or wind application near Seamer Wind Farm - Hambleton is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.
By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.
Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.
The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Stockton-on-Tees.