Onshore wind · United Kingdom

Seamer Windfarm - Stockton on Tees

Operator Broadview Energy · Owner Broadview Ventures Limited

Operational6 MWData checked 16 November 2026Source record dated 29 November 2012

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Seamer Windfarm - Stockton on Tees is a 6 MW wind farm 5.1 km south-east of Thornaby-on-Tees, County Durham, United Kingdom. Its planning application (09/0736/EIS) went to Stockton-on-Tees on 27 March 2009 and was granted on 25 August 2009. It has been operating since 1 November 2012. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 7 other sites and 313 energy sites within 40 km for Seamer Windfarm - Stockton on Tees

Members see the sites and incidents around this one, and every record behind them.

BROADVIEW ENERGY LIMITED (04657768), active, since 2003. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Broadview Energy
Owner
Broadview Ventures Limited
Location
Between the villages of Hilton and Seamer on the Stockton-on-Tees and North Yorkshire boundaries., County Durham, United Kingdom
Planning authority
Stockton-on-Tees
Planning application
09/0736/EIS
First operating
2012
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 09/0736/EIS, with what the planning evidence pack adds for this site.

Every application in Stockton-on-Tees · Alerts for applications and incidents near here

  • 27 March 2009 Planning application submitted
  • 25 August 2009 Planning permission granted
  • 1 April 2012 Construction started
  • 1 November 2012 Operational

None found. The register holds no published incident that names Seamer Windfarm - Stockton on Tees. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Seamer Windfarm - Stockton on Tees had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Seamer Windfarm - Stockton on Tees; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Seamer Windfarm - Stockton on Tees?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 29 November 2012.
Where is Seamer Windfarm - Stockton on Tees?
5.1 km south-east of Thornaby-on-Tees, County Durham, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).