Onshore wind · United Kingdom
Seamer Wind Farm - Hambleton
Operator Infinis, previously Broadview Energy
Operational4 MWData checked 16 November 2026Source record dated 29 November 2012
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Seamer Wind Farm - Hambleton is a 4 MW wind farm 4.8 km south-east of Thornaby-on-Tees, Cleveland, United Kingdom. Its planning application (09/00859/FUL) went to Stockton-on-Tees on 27 March 2009 and was granted on 18 September 2009. It has been operating since 1 November 2012. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 33 other energy sites within 10 km, 3 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Seamer Wind Farm - Hambleton changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Infinis, previously Broadview Energy
- Location
- Land Adjacent Hilton Road, Seamer, Middlesbrough, Cleveland, United Kingdom
- Planning authority
- Stockton-on-Tees
- Planning application
- 09/00859/FUL
- Appeal reference
- APP/G2713/A/09/2114490
- First operating
- 2012
- Turbines
- 2
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 09/00859/FUL, with what the planning evidence pack adds for this site.
Every application in Stockton-on-Tees · Alerts for applications and incidents near here
Timeline
- 27 March 2009 Planning application submitted
- 18 September 2009 Planning permission granted
- 1 October 2011 Construction started
- 1 November 2012 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Seamer Wind Farm - Hambleton. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Seamer Wind Farm - Hambleton had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Seamer Wind Farm - Hambleton; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Seamer Wind Farm - Hambleton?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 29 November 2012.
- Where is Seamer Wind Farm - Hambleton?
- 4.8 km south-east of Thornaby-on-Tees, Cleveland, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).