Onshore wind · United Kingdom
Hill of Fiddes
Operator Infinis, previously Broadview Energy
Operational6.9 MWData checked 16 November 2026Source record dated 9 May 2012
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Hill of Fiddes is a 6.9 MW wind farm 6.3 km south of Ellon, Grampian, United Kingdom. Its planning application (APP/2007/3578) went to Aberdeenshire on 3 September 2007 and was granted on 1 April 2008. It has been operating since 20 February 2010. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 19 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Hill of Fiddes changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 6.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Infinis, previously Broadview Energy
- Location
- Hill of FiddesUdny StationCultercullen, Grampian, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2007/3578
- First operating
- 2010
- Turbines
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2007/3578, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 3 September 2007 Planning application submitted
- 1 April 2008 Planning permission granted
- 1 July 2009 Construction started
- 20 February 2010 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Hill of Fiddes. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Hill of Fiddes had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Hill of Fiddes; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Hill of Fiddes?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 9 May 2012.
- Where is Hill of Fiddes?
- 6.3 km south of Ellon, Grampian, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).