← Back to Grampian
Planning pack for this site, £295Other options

Solar · United Kingdom

Kincraig - Solar Farm and battery storage system

Operator Renewable Connections Developments Limited · Owner Rivington Energy Limited

Under Construction21 MWData checked 16 November 2026Source record dated 17 June 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kincraig - Solar Farm and battery storage system is a 21 MW solar farm 5.7 km south of Ellon, Grampian, United Kingdom. Its planning application (APP/2022/0838) went to Aberdeenshire on 14 April 2022 and was granted on 18 October 2022. Construction started on 1 October 2024. Its status in the Renewable Energy Planning Database (UK government) is under construction. There are 13 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

RENEWABLE CONNECTIONS DEVELOPMENTS LIMITED (12351905), active, since 2019. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kincraig - Solar Farm and battery storage system sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 439 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool439 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells470 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire622 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
21 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Under Construction
Operator or applicant
Renewable Connections Developments Limited
Owner
Rivington Energy Limited
Location
Kincraig Ellon, Grampian, AB41 7RJ, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2022/0838

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2022/0838, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 14 April 2022 Planning application submitted
  • 18 October 2022 Planning permission granted
  • 1 October 2024 Construction started

None found. The register holds no published incident that names Kincraig - Solar Farm and battery storage system. If you know of one, report it (confidential reports are anonymised).

Has Kincraig - Solar Farm and battery storage system had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kincraig - Solar Farm and battery storage system; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kincraig - Solar Farm and battery storage system?
Under Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 17 June 2025.
Where is Kincraig - Solar Farm and battery storage system?
5.7 km south of Ellon, Grampian, United Kingdom (postcode AB41 7RJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).