Onshore wind · United Kingdom
Cairndailly Farm - Wind turbine
Operator DC Smith Skelmonae Wind Farm Limited & Formartine Partnership & JKR Contractors Ltd
Application Submitted3 MWData checked 16 November 2026Source record dated 26 January 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Cairndailly Farm - Wind turbine is a 3 MW wind farm in Ellon, Aberdeenshire, United Kingdom. Its planning application (APP/2023/2303) went to Aberdeenshire on 11 January 2024. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 18 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Cairndailly Farm - Wind turbine changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cairndailly Farm - Wind turbine sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1386, Wind turbine fire near St Cyrus in Aberdeenshire, 69 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1386 | 2022 | Wind turbine fire near St Cyrus in Aberdeenshire | 69 km | Minor |
| EIR-0441 | 2025 | Wind turbine collapses at Aviva's Pitheavlis site in Perth | 136 km | Significant |
| EIR-0767 | 2024 | Nordex turbine fire prompts investigation at Scottish wind farm | 139 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Onshore wind
- Capacity
- 3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- DC Smith Skelmonae Wind Farm Limited & Formartine Partnership & JKR Contractors Ltd
- Location
- Cairnadailly Farm, Ellon, Aberdeenshire, AB41, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2023/2303
- Turbines
- 1, 99.91 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2023/2303, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 11 January 2024 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Cairndailly Farm - Wind turbine. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Cairndailly Farm - Wind turbine had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Cairndailly Farm - Wind turbine; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Cairndailly Farm - Wind turbine?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2024.
- Where is Cairndailly Farm - Wind turbine?
- In Ellon, Aberdeenshire, United Kingdom (postcode AB41).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).