Solar · United Kingdom
Logierieve Farm, Udny - Solar Array
Operator Roderic Bruce
Revised0.3 MWData checked 16 November 2026Source record dated 31 October 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Logierieve Farm, Udny - Solar Array is a 0.3 MW solar farm 5 km south-west of Ellon, Aberdeenshire, United Kingdom. Its planning application (APP/2024/1187) went to Aberdeenshire on 21 August 2024 and was withdrawn on 7 May 2025. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 22 other energy sites within 10 km, 2 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Logierieve Farm, Udny - Solar Array changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Logierieve Farm, Udny - Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 99 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1476 | 2026 | House fire reported to have started on solar panels in Carnoustie | 99 km | Significant |
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 162 km | Minor |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 216 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.3 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Roderic Bruce
- Location
- E/O Logierieve Farm, Udny, Ellon, Aberdeenshire, AB41 6PT, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2024/1187
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2024/1187, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 21 August 2024 Planning application submitted
- 7 May 2025 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Logierieve Farm, Udny - Solar Array. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Logierieve Farm, Udny - Solar Array had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Logierieve Farm, Udny - Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Logierieve Farm, Udny - Solar Array?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 31 October 2025.
- Where is Logierieve Farm, Udny - Solar Array?
- 5 km south-west of Ellon, Aberdeenshire, United Kingdom (postcode AB41 6PT).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).