Onshore wind · United Kingdom

Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower

Operator Film Ocean Limited

Application Withdrawn0.1 MWData checked 16 November 2026Source record dated 26 January 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower is a 0.1 MW wind farm on the edge of Ellon, Aberdeenshire, United Kingdom. Its planning application (APP/2024/1248) went to Aberdeenshire on 5 August 2024 and was withdrawn on 27 August 2025. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 19 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

237 energy sites within 40 km for Balmacassie Brae, Balmacassie Commercial Park - Wind…

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
0.1 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Film Ocean Limited
Location
Balmacassie Brae, Balmacassie Commercial Park, Ellon, Aberdeenshire, AB41 8BY, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2024/1248

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2024/1248, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 5 August 2024 Planning application submitted
  • 27 August 2025 Application withdrawn

None found. The register holds no published incident that names Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2026.
Where is Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower?
On the edge of Ellon, Aberdeenshire, United Kingdom (postcode AB41 8BY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).