Onshore wind · United Kingdom
Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower
Operator Film Ocean Limited
Application Withdrawn0.1 MWData checked 16 November 2026Source record dated 26 January 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower is a 0.1 MW wind farm on the edge of Ellon, Aberdeenshire, United Kingdom. Its planning application (APP/2024/1248) went to Aberdeenshire on 5 August 2024 and was withdrawn on 27 August 2025. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 19 other energy sites within 10 km, 14 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 0.1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Withdrawn (Planning Application Withdrawn)
- Operator or applicant
- Film Ocean Limited
- Location
- Balmacassie Brae, Balmacassie Commercial Park, Ellon, Aberdeenshire, AB41 8BY, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2024/1248
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2024/1248, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 5 August 2024 Planning application submitted
- 27 August 2025 Application withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower?
- Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 26 January 2026.
- Where is Balmacassie Brae, Balmacassie Commercial Park - Wind Power Tower?
- On the edge of Ellon, Aberdeenshire, United Kingdom (postcode AB41 8BY).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).