Hillhead of Turnerhall

Operator Formartine

Application Refused3 MWData checked 16 November 2026Source record dated 1 July 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hillhead of Turnerhall is a 3 MW wind farm 4.4 km north of Ellon, Grampian, United Kingdom. Its planning application (APP/2013/1562) went to Aberdeenshire on 27 June 2013 and was refused on 28 May 2015. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 22 other energy sites within 10 km, 18 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

243 energy sites within 40 km for Hillhead of Turnerhall

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Formartine
Location
Land West of Hillhead of Turnerhall, Auchnagatt, Ellon, Grampian, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2013/1562
Turbines
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2013/1562, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 27 June 2013 Planning application submitted
  • 28 May 2015 Planning permission refused

None found. The register holds no published incident that names Hillhead of Turnerhall. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Hillhead of Turnerhall had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hillhead of Turnerhall; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Hillhead of Turnerhall?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 1 July 2015.
Where is Hillhead of Turnerhall?
4.4 km north of Ellon, Grampian, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).