Battery storage · United Kingdom

Stainton Way - Micro Energy storage

Operator AMP Clean Energy · Owner Aggregated Micro Power Holdings Limited

Application Withdrawn0.2 MWData checked 16 November 2026Source record dated 12 May 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Stainton Way - Micro Energy storage is a 0.2 MW battery storage site 4.2 km south-east of Thornaby-on-Tees, Cleveland, United Kingdom. Its planning application (24/0383/FUL) went to Middlesbrough on 24 September 2024 and was withdrawn on 23 April 2025. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 54 other energy sites within 10 km, 17 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 382 other sites and 311 energy sites within 40 km for Stainton Way - Micro Energy storage

Members see the sites and incidents around this one, and every record behind them.

AMP CLEAN ENERGY LIMITED (11320925), active, since 2018. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
AMP Clean Energy
Owner
Aggregated Micro Power Holdings Limited
Location
Hemlington Grange Farm, Stainton Way, Hemlington, Middlesbrough, Cleveland, TS8 9GL, United Kingdom
Planning authority
Middlesbrough
Planning application
24/0383/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/0383/FUL, with what the planning evidence pack adds for this site.

Every application in Middlesbrough · Alerts for applications and incidents near here

  • 24 September 2024 Planning application submitted
  • 23 April 2025 Application withdrawn

None found. The register holds no published incident that names Stainton Way - Micro Energy storage. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Stainton Way - Micro Energy storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stainton Way - Micro Energy storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Stainton Way - Micro Energy storage?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2025.
Where is Stainton Way - Micro Energy storage?
4.2 km south-east of Thornaby-on-Tees, Cleveland, United Kingdom (postcode TS8 9GL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).