Planning pack for this site, £295Other options

Battery storage · United Kingdom

Nobel Secondary School, Mobbsbury Way - Energy Storage

Operator AMP Clean Energy · Owner Aggregated Micro Power Holdings Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 10 March 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Nobel Secondary School, Mobbsbury Way - Energy Storage is a 0.2 MW battery storage site on the edge of Stevenage, Hertfordshire, United Kingdom. Its planning application (23/00041/FP) went to Stevenage on 16 January 2023 and was granted on 2 March 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 44 other energy sites within 10 km, 17 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

AMP CLEAN ENERGY LIMITED (11320925), active, since 2018. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Nobel Secondary School, Mobbsbury Way - Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 62 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction62 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire123 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells149 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
AMP Clean Energy
Owner
Aggregated Micro Power Holdings Limited
Location
Nobel School, Mobbsbury Way, Stevenage, Hertfordshire, SG2 0HS, United Kingdom
Planning authority
Stevenage
Planning application
23/00041/FP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/00041/FP, with what the planning evidence pack adds for this site.

Every application in Stevenage · Alerts for applications and incidents near here

  • 16 January 2023 Planning application submitted
  • 2 March 2023 Planning permission granted
  • 2 March 2026 Planning permission expired

None found. The register holds no published incident that names Nobel Secondary School, Mobbsbury Way - Energy Storage. If you know of one, report it (confidential reports are anonymised).

Has Nobel Secondary School, Mobbsbury Way - Energy Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Nobel Secondary School, Mobbsbury Way - Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Nobel Secondary School, Mobbsbury Way - Energy Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 March 2023.
Where is Nobel Secondary School, Mobbsbury Way - Energy Storage?
On the edge of Stevenage, Hertfordshire, United Kingdom (postcode SG2 0HS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).