← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Stirling

Manor Powis

Application Withdrawn5 MWApplication 16/00503/FULSubmitted 29 July 2016Withdrawn 3 July 2017

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
16/00503/FUL
Planning authority
Stirling
Nation
Scotland
Technology
Solar
Capacity
5 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Stirling Council
Location
Land Some 350 Metres South Of, Manor Steps, Manor Powis Road, Stirling, Central, FK9 5QJ
  • 29 July 2016 Planning application submitted
  • 3 July 2017 Application withdrawn

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 27 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline27 kmMinor
EIR-14762026House fire reported to have started on solar panels in Carnoustie83 kmSignificant
EIR-20162022Solar panel fire evacuates Hawick High School105 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near FK9 5QJ is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Stirling.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.