Unit 15, Borrowmeadow Road

Operator Flexible Grid Power

Abandoned19 MWData checked 16 November 2026Source record dated 27 November 2019

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Unit 15, Borrowmeadow Road is a 19 MW battery storage site in Stirling, United Kingdom. Its planning application (17/00665/FUL) went to Stirling on 22 August 2017. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 28 other energy sites within 10 km, 9 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

377 energy sites within 40 km for Unit 15, Borrowmeadow Road

Members see the sites and incidents around this one, and every record behind them.

Technology
Battery storage (Stand-alone Storage)
Capacity
19 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
Flexible Grid Power
Location
Unit 15, Land adj and Rear Of Units @, Borrowmeadow Road, Stirling, Central, Stirling, FK7 7FB, United Kingdom
Planning authority
Stirling
Planning application
17/00665/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 17/00665/FUL, with what the planning evidence pack adds for this site.

Every application in Stirling · Alerts for applications and incidents near here

  • 22 August 2017 Planning application submitted

None found. The register holds no published incident that names Unit 15, Borrowmeadow Road. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Unit 15, Borrowmeadow Road had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Unit 15, Borrowmeadow Road; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Unit 15, Borrowmeadow Road?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 27 November 2019.
Where is Unit 15, Borrowmeadow Road?
In Stirling, United Kingdom (postcode FK7 7FB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).