← Back to Stirling

Energy sites / United Kingdom / Stirling

Battery storage · United Kingdom

Bolfornought Farm

Application Withdrawn49.9 MWChecked 6 October 2026Last changed in the dataset 16 July 2021

Technology
Battery storage (Stand-alone Storage)
Capacity
49.9 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Intelligent Land Investments
Location
Land 650m SW Of Bolfornought F, Stirling, Central, Stirling, FK7 7LL, United Kingdom
Planning authority
Stirling
Planning application
21/00293/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 14 April 2021 Planning application submitted
  • 16 July 2021 Application withdrawn
  • 28 January 2022 Planning permission refused

None found. The register holds no published incident that names Bolfornought Farm. If you know of one, report it (confidential reports are anonymised).

The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.