Solar · United Kingdom

Manor Powis

Operator Stirling Council

Application Withdrawn5 MWData checked 16 November 2026Source record dated 28 July 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Manor Powis is a 5 MW solar farm 3.2 km west of Tullibody, Stirling, United Kingdom. Its planning application (16/00503/FUL) went to Stirling on 29 July 2016 and was withdrawn on 3 July 2017. Its status in the Renewable Energy Planning Database (UK government) is application withdrawn. There are 23 other energy sites within 10 km, 7 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 3 other sites and 369 energy sites within 40 km for Manor Powis

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
Stirling Council
Location
Land Some 350 Metres South Of, Manor Steps, Manor Powis Road, Stirling, Central, Stirling, FK9 5QJ, United Kingdom
Planning authority
Stirling
Planning application
16/00503/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 16/00503/FUL, with what the planning evidence pack adds for this site.

Every application in Stirling · Alerts for applications and incidents near here

  • 29 July 2016 Planning application submitted
  • 3 July 2017 Application withdrawn

None found. The register holds no published incident that names Manor Powis. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Manor Powis had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Manor Powis; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Manor Powis?
Application Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 28 July 2017.
Where is Manor Powis?
3.2 km west of Tullibody, Stirling, United Kingdom (postcode FK9 5QJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).