Planning application · Solar · Stirling

Cottrell Building, East Link Road - Solar PV Panels

Awaiting Construction0.5 MWApplication 24/00390/FULSubmitted 19 June 2024Granted 12 August 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
24/00390/FUL
Planning authority
Stirling
County or area
Strathclyde
Nation
Scotland
Technology
Solar
Capacity
0.5 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
University of Stirling
Location
Cottrell Building East Link Road Bridge Of Allan, FK9 4LA
  • 19 June 2024 Planning application submitted
  • 12 August 2024 Planning permission granted
  • 12 August 2027 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 30 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline30 kmMinor
EIR-14762026House fire reported to have started on solar panels in Carnoustie84 kmSignificant
EIR-20162022Solar panel fire evacuates Hawick High School107 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near FK9 4LA is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Stirling.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.