Planning application · Solar · Somerset

Higher Knapp Farm

Operational1.5 MWApplication 24/12/0039Submitted 8 October 2012Granted 11 January 2013

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
24/12/0039
Planning authority
Somerset
Nation
England
Technology
Solar
Capacity
1.5 MW
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Location
Higher Knapp Farm, Knapp, Taunton, Somerset, TA3 6AY
First operating
2013
  • 8 October 2012 Planning application submitted
  • 11 January 2013 Planning permission granted
  • 11 February 2013 Construction started
  • 21 March 2013 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1526, Solar panels catch fire on a retail or public building roof in South Petherton, 15 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15262025Solar panels catch fire on a retail or public building roof in South Petherton15 kmMinor
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea23 kmMinor
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton38 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Higher Knapp Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Somerset.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.