Helland Meads is a 1.2 MW solar farm 10 km east of Taunton, Somerset, United Kingdom. Its planning application (24/14/0020) went to Somerset on 9 April 2014 and was granted on 30 June 2014. It has been operating since 1 November 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 18 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 409 other sites and 337 energy sites within 40 km for Helland Meads

Members see the sites and incidents around this one, and every record behind them.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Private Developer
Location
Pondpool Lane, Helland, North Curry, Taunton, Somerset, TA3 6DU, United Kingdom
Planning authority
Somerset
Planning application
24/14/0020
First operating
2014

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/14/0020, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 9 April 2014 Planning application submitted
  • 30 June 2014 Planning permission granted
  • 29 September 2014 Construction started
  • 1 November 2014 Operational

None found. The register holds no published incident that names Helland Meads. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Helland Meads had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Helland Meads; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Helland Meads?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 27 July 2015.
Where is Helland Meads?
10 km east of Taunton, Somerset, United Kingdom (postcode TA3 6DU).