← Back to Somerset
Planning pack for this site, £295Other options

Solar · United Kingdom

Helland Meads

Operator Private Developer

Revised1.2 MWData checked 16 November 2026Source record dated 24 January 2014

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Helland Meads is a 1.2 MW solar farm 10 km east of Taunton, Somerset, United Kingdom. Its planning application (24/13/0044) went to Somerset on 18 September 2013 and was withdrawn on 15 November 2013. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 18 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Helland Meads sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1526, Solar panels catch fire on a retail or public building roof in South Petherton, 13 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15262025Solar panels catch fire on a retail or public building roof in South Petherton13 kmMinor
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea23 kmMinor
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton36 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Private Developer
Location
Pondpool Lane, Helland, North Curry, Taunton, Somerset, TA3 6DU, United Kingdom
Planning authority
Somerset
Planning application
24/13/0044

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/13/0044, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 18 September 2013 Planning application submitted
  • 15 November 2013 Application withdrawn

None found. The register holds no published incident that names Helland Meads. If you know of one, report it (confidential reports are anonymised).

Has Helland Meads had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Helland Meads; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Helland Meads?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 24 January 2014.
Where is Helland Meads?
10 km east of Taunton, Somerset, United Kingdom (postcode TA3 6DU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).