← Back to Somerset

Solar · United Kingdom

Higher Knapp Farm

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational1.5 MWData checked 16 November 2026Source record dated 12 April 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Higher Knapp Farm is a 1.5 MW solar farm 7.5 km east of Taunton, Somerset, United Kingdom. Its planning application (24/12/0039) went to Somerset on 8 October 2012 and was granted on 11 January 2013. It has been operating since 21 March 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 19 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 324 energy sites within 40 km for Higher Knapp Farm

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Higher Knapp Farm, Knapp, Taunton, Somerset, TA3 6AY, Somerset, United Kingdom
Planning authority
Somerset
Planning application
24/12/0039
First operating
2013

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/12/0039, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 8 October 2012 Planning application submitted
  • 11 January 2013 Planning permission granted
  • 11 February 2013 Construction started
  • 21 March 2013 Operational

None found. The register holds no published incident that names Higher Knapp Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Higher Knapp Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Higher Knapp Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Higher Knapp Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 12 April 2013.
Where is Higher Knapp Farm?
7.5 km east of Taunton, Somerset, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).