← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · South Cambridgeshire

Chittering Solar Farm Extension

Operational6.3 MWApplication S/1542/12/FLSubmitted 24 July 2012Granted 15 October 2012

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
S/1542/12/FL
Planning authority
South Cambridgeshire
County or area
Cambridgeshire
Nation
England
Technology
Solar
Capacity
6.3 MW
Status
Operational
Operator or applicant
Abbey Properties Cambs
Location
Land at, Radical Farm, Chittering Drove, Chittering, Cambridgeshire
First operating
2013
  • 24 July 2012 Planning application submitted
  • 15 October 2012 Planning permission granted
  • 28 January 2013 Construction started
  • 21 March 2013 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1262, Fire reported on solar-panel roof at Fitzwilliam College auditorium, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium14 kmMinor
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof42 kmSignificant
EIR-14932026Solar panels catch fire on Bedford warehouse roof47 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Chittering Solar Farm Extension is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in South Cambridgeshire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.