← Back to Cambridgeshire

Energy sites / United Kingdom / Cambridgeshire

Solar · United Kingdom

Chittering Solar Farm

Operational5 MWChecked 6 October 2026Last changed in the dataset 23 October 2012

Technology
Solar
Capacity
5 MW
Status
Operational
Operator or applicant
Abbey Renewables
Location
Radical Farm, Chittering Drove, Chittering, Cambridgeshire, Cambridgeshire, United Kingdom
Planning authority
South Cambridgeshire
Planning application
S/2198/10
First operating
2012

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 15 December 2010 Planning application submitted
  • 15 March 2011 Planning permission granted
  • 28 June 2012 Operational

None found. The register holds no published incident that names Chittering Solar Farm. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.