Stowbridge Farm
Operator Magnetar Solar
Operational24 MWData checked 16 November 2026Source record dated 5 February 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Stowbridge Farm is a 24 MW solar farm 7.3 km north of Waterbeach, Cambridgeshire, United Kingdom. Its planning application (12/00732/ESF) went to East Cambridgeshire on 24 September 2012 and was granted on 10 December 2012. It has been operating since 28 March 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 37 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Stowbridge Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 24 MW (this record)
- All phases
- 34 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Magnetar Solar
- Location
- Green End, Stretham, Cambridgeshire, Cambridgeshire, CB6 3LF, United Kingdom
- Planning authority
- East Cambridgeshire
- Planning application
- 12/00732/ESF
- First operating
- 2014
This record is 24 MW, one part of a site built in phases. With Stowbridge Farm - Extension (Phase 2) (10 MW) the phases on the register add up to 34 MW. Stowbridge Farm - Extension (Phase 2)
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 12/00732/ESF, with what the planning evidence pack adds for this site.
Every application in East Cambridgeshire · Alerts for applications and incidents near here
Timeline
- 24 September 2012 Planning application submitted
- 10 December 2012 Planning permission granted
- 28 March 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Stowbridge Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Stowbridge Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Stowbridge Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Stowbridge Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 February 2015.
- Where is Stowbridge Farm?
- 7.3 km north of Waterbeach, Cambridgeshire, United Kingdom (postcode CB6 3LF).