Solar · United Kingdom

Stowbridge Farm - Extension (Phase 1)

Operator FC Palmer & Sons Ltd

Operational10 MWData checked 16 November 2026Source record dated 28 May 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Stowbridge Farm - Extension (Phase 1) is a 10 MW solar farm 7.5 km west of Soham, Cambridgeshire, United Kingdom. Its planning application (S/1516/13/FL) went to East Cambridgeshire on 20 August 2013 and was granted on 6 March 2014. It has been operating since 20 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 38 other energy sites within 10 km, 23 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

321 energy sites within 40 km for Stowbridge Farm - Extension (Phase 1)

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
FC Palmer & Sons Ltd
Location
Stowbridge Farm, Green End, Stretham, Cambridgeshire, Cambridgeshire, CB6 3LF, United Kingdom
Planning authority
East Cambridgeshire
Planning application
S/1516/13/FL
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for S/1516/13/FL, with what the planning evidence pack adds for this site.

Every application in East Cambridgeshire · Alerts for applications and incidents near here

  • 20 August 2013 Planning application submitted
  • 6 March 2014 Planning permission granted
  • 1 December 2014 Construction started
  • 20 March 2015 Operational

None found. The register holds no published incident that names Stowbridge Farm - Extension (Phase 1). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Stowbridge Farm - Extension (Phase 1) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stowbridge Farm - Extension (Phase 1); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Stowbridge Farm - Extension (Phase 1)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 28 May 2015.
Where is Stowbridge Farm - Extension (Phase 1)?
7.5 km west of Soham, Cambridgeshire, United Kingdom (postcode CB6 3LF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).