← Back to Cambridgeshire

Energy sites / United Kingdom / Cambridgeshire

Solar · United Kingdom

Turves Solar Farm

Operational5 MWChecked 6 October 2026Last changed in the dataset 12 April 2013

Technology
Solar
Capacity
5 MW
Status
Operational
Operator or applicant
Abbey Renewables
Location
Land West Of 15 Burnthouse Sidings, Turves, Whittlesey, Cambridgeshire, United Kingdom
Planning authority
Fenland
Planning application
F/YR11/0362/F
First operating
2013

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 13 May 2011 Planning application submitted
  • 12 April 2012 Planning permission granted
  • 2 November 2012 Construction started
  • 19 March 2013 Operational

None found. The register holds no published incident that names Turves Solar Farm. If you know of one, report it (confidential reports are anonymised).

The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.

What fails at solar farms · All solar farms incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.