Onshore wind · United Kingdom
Burnt House Farm
Operator Fivestone Ltd
Operational6 MWData checked 16 November 2026Source record dated 25 June 2013
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Burnt House Farm is a 6 MW wind farm 5.7 km south-east of Primrose Place, Cambridgeshire, United Kingdom. Its planning application (F/YR09/0392/F) went to Fenland on 10 June 2009 and was granted on appeal on 8 July 2011. It has been operating since 19 June 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 30 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Burnt House Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Fivestone Ltd
- Location
- Burnt House Road, Whittlesey, Burnthouse Sidings, Peterborough, Cambs, Cambridgeshire, PE7 2HP, United Kingdom
- Planning authority
- Fenland
- Planning application
- F/YR09/0392/F
- Appeal reference
- 10/00019/REF
- First operating
- 2013
- Turbines
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for F/YR09/0392/F, with what the planning evidence pack adds for this site.
Every application in Fenland · Alerts for applications and incidents near here
Timeline
- 10 June 2009 Planning application submitted
- 4 January 2010 Planning permission refused
- 8 July 2011 Planning permission granted
- 8 July 2011 Appeal granted
- 1 January 2013 Construction started
- 19 June 2013 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Burnt House Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Burnt House Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Burnt House Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Burnt House Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 25 June 2013.
- Where is Burnt House Farm?
- 5.7 km south-east of Primrose Place, Cambridgeshire, United Kingdom (postcode PE7 2HP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).