Backup generator fire causes lengthy data centre outage in Ogden
Apr 2021Published 2 Oct 2026Updated 13 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on data centre incidents in the United States, and an email when EIR-1834 is updated. No account needed; unsubscribe in one click.
Confirm your email and every data centre incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
What happened
Over the Easter weekend of 2021, city power to a WebNX data centre in Ogden, Utah was disrupted and the backup generators started automatically, as designed. During the transfer, one backup generator that had been recently tested and benchmarked for this situation suffered a catastrophic failure and caught fire. The fire initiated the facility's fire suppression protocol, and fire officials cut power to the entire building. WebNX said customer servers in one main bay were exposed to water and may have suffered water damage, and that no fire damage was inflicted on customer servers.
A fire marshal told The Register that the blaze originated in the generator and spread to several servers, and that the suppression system contained it. Power stayed off until an electrical engineer inspected the building. By the Wednesday many servers were back online, but some machines needed inspection and possible rebuilding, and some clients expected outages of several weeks.
Contributing factors
The sources report that the generator failed during the transfer from city power to backup power. The sources do not establish why the generator failed.
Lessons learned
- Recent generator testing does not guarantee that a generator will survive a real transfer from mains power, so operators should review failure modes during automatic transfer.
- Water from fire suppression can damage IT equipment even where fire damage is avoided, so bay-level water protection and recovery plans matter.
- Power restoration after a fire requires a qualified electrical inspection, so operators should plan for extended downtime and clear customer communication.
More lessons on design, standards and commissioning, fire suppression and firefighting, maintenance, inspection and ageing assets, from every incident on the register.