Fire and explosion reported at solar-storage BESS in Hadong, South Korea
Oct 2019Published 11 Sept 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on hybrid co-located incidents in South Korea, and an email when EIR-0662 is updated. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): LG Chem
What happened
A fire occurred in a battery energy storage system (BESS) at a solar-plus-storage facility in Hadong, South Korea, on 21 October 2019. A nearby resident reported hearing an explosion at the time of the incident. The cause was determined to be a sudden deterioration in the insulation performance of the battery system. The BESS used NMC lithium-ion battery cells supplied by LG Chem and was around 1.3 years old at the time. Damage was estimated at around one percent of the installed capacity. The incident is recorded in the EPRI BESS Failure Incident Database.
Contributing factors
Sudden deterioration in insulation performance within the battery system. The battery cells were supplied by LG Chem and used NMC chemistry, installed in an outdoor architecture as part of a solar integration application.
Lessons learned
- Insulation resistance should be continuously monitored in outdoor battery storage systems, as degradation can develop gradually before triggering a fault.
- Early warning systems capable of detecting insulation deterioration could help prevent escalation to fire or explosion.
- Battery systems co-located with solar generation require the same rigorous electrical safety monitoring as standalone BESS installations, regardless of relatively young system age.
More lessons on detection and monitoring, from every incident on the register.
Standards referenced
EPRI
Source
Published 2026-09-11. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.