Solar · United Kingdom
Watling Street, Caddington - Solar Farm
Operator Chiltern Renewables Hockliffe Limited · Owner Encavis AG
Awaiting Construction19.7 MWData checked 16 November 2026Source record dated 29 September 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Watling Street, Caddington - Solar Farm is a 19.7 MW solar farm 4 km south-east of Dunstable, Bedfordshire, United Kingdom. Its planning application (CB/24/02069/FULL) went to Central Bedfordshire on 15 July 2024 and was granted on 14 August 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 51 other energy sites within 10 km, 31 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Watling Street, Caddington - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
CHILTERN RENEWABLES HOCKLIFFE LIMITED (13029659), active, since 2020. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Watling Street, Caddington - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1493, Solar panels catch fire on Bedford warehouse roof, 32 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1493 | 2026 | Solar panels catch fire on Bedford warehouse roof | 32 km | Minor |
| EIR-1519 | 2025 | Solar panels involved in outbuilding roof fire in Bourne End | 34 km | Minor |
| EIR-1514 | 2024 | Garage fire destroys solar panels in Southgate, with a battery storage fault suspected | 35 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 19.7 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Chiltern Renewables Hockliffe Limited
- Owner
- Encavis AG
- Location
- E/O Watling Street, Adj Horse And Jockey Public House, Caddington, Dunstable, Bedfordshire, LU6, United Kingdom
- Planning authority
- Central Bedfordshire
- Planning application
- CB/24/02069/FULL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for CB/24/02069/FULL, with what the planning evidence pack adds for this site.
Every application in Central Bedfordshire · Alerts for applications and incidents near here
Timeline
- 15 July 2024 Planning application submitted
- 14 August 2025 Planning permission granted
- 14 August 2028 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Watling Street, Caddington - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Watling Street, Caddington - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Watling Street, Caddington - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Watling Street, Caddington - Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 September 2025.
- Where is Watling Street, Caddington - Solar Farm?
- 4 km south-east of Dunstable, Bedfordshire, United Kingdom (postcode LU6).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).