← Back to Bedfordshire

Solar · United Kingdom

Caddington Solar Farm (Phase 2)

Operator Emsrayne Limited

Operational5 MWData checked 16 November 2026Source record dated 20 May 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Caddington Solar Farm (Phase 2) is a 5 MW solar farm 4.4 km south-west of Luton, Bedfordshire, United Kingdom. Its planning application (CB/14/04064) went to Central Bedfordshire on 21 October 2014 and was granted on 2 February 2015. It has been operating since 30 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 47 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

731 energy sites within 40 km for Caddington Solar Farm (Phase 2)

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW (this record)
All phases
8 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Emsrayne Limited
Location
Millfield Farm, Millfield Lane, Caddington, Luton, Bedfordshire, LU1 4AJ, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/14/04064
First operating
2016

This record is 5 MW, one part of a site built in phases. With Caddington Solar Farm (Phase 1) (3 MW) the phases on the register add up to 8 MW. Caddington Solar Farm (Phase 1)

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CB/14/04064, with what the planning evidence pack adds for this site.

Every application in Central Bedfordshire · Alerts for applications and incidents near here

  • 21 October 2014 Planning application submitted
  • 2 February 2015 Planning permission granted
  • 15 January 2016 Construction started
  • 30 March 2016 Operational

None found. The register holds no published incident that names Caddington Solar Farm (Phase 2). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Caddington Solar Farm (Phase 2) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Caddington Solar Farm (Phase 2); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Caddington Solar Farm (Phase 2)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 May 2016.
Where is Caddington Solar Farm (Phase 2)?
4.4 km south-west of Luton, Bedfordshire, United Kingdom (postcode LU1 4AJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).