← Back to Bedfordshire

Energy sites / United Kingdom / Bedfordshire

Battery storage · United Kingdom

Avenue Power - Urban Reserve Flexible Energy Facility

Application Withdrawn5 MWChecked 6 October 2026Last changed in the dataset 28 February 2022

Technology
Battery storage (Stand-alone Storage)
Capacity
5 MW
Status
Application Withdrawn (Planning Application Withdrawn)
Operator or applicant
AMP Energy Services Limited
Location
Avenue Power, Eastern Avenue Industrial Estate, Eastern Avenue, Dunstable, Bedfordshire, LU5 4JY, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/21/05568/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 11 January 2022 Planning application submitted
  • 21 February 2022 Application withdrawn

None found. The register holds no published incident that names Avenue Power - Urban Reserve Flexible Energy Facility. If you know of one, report it (confidential reports are anonymised).

The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 176 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.