Solar · United Kingdom

The Chalk Hills Academy, Leagrave High Street - Solar Panels

Operator EEnergy Group plc

Awaiting Construction0.3 MWData checked 16 November 2026Source record dated 12 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

The Chalk Hills Academy, Leagrave High Street - Solar Panels is a 0.3 MW solar farm on the edge of Dunstable, Bedfordshire, United Kingdom. Its planning application (26/00085/PAOSPE) went to Luton on 5 February 2026 and was granted on 2 April 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 65 other energy sites within 10 km, 35 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

EENERGY GROUP PLC (05357433), active, since 2005. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for The Chalk Hills Academy, Leagrave High Street - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1493, Solar panels catch fire on Bedford warehouse roof, 28 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14932026Solar panels catch fire on Bedford warehouse roof28 kmMinor
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End38 kmMinor
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected39 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
EEnergy Group plc
Location
The Chalk Hills Academy Leagrave High Street, Bedfordshire, LU4 0NE, United Kingdom
Planning authority
Luton
Planning application
26/00085/PAOSPE

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/00085/PAOSPE, with what the planning evidence pack adds for this site.

Every application in Luton · Alerts for applications and incidents near here

  • 5 February 2026 Planning application submitted
  • 2 April 2026 Planning permission granted

None found. The register holds no published incident that names The Chalk Hills Academy, Leagrave High Street - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has The Chalk Hills Academy, Leagrave High Street - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names The Chalk Hills Academy, Leagrave High Street - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of The Chalk Hills Academy, Leagrave High Street - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 12 May 2026.
Where is The Chalk Hills Academy, Leagrave High Street - Solar Panels?
On the edge of Dunstable, Bedfordshire, United Kingdom (postcode LU4 0NE).