← Back to Bedfordshire

Energy sites / United Kingdom / Bedfordshire

Battery storage · United Kingdom

Dc1 Boscombe Road

Planning Permission Expired1.7 MWChecked 6 October 2026Last changed in the dataset 4 February 2020

Technology
Battery storage (Co-located with RE)
Capacity
1.7 MW
Status
Planning Permission Expired
Operator or applicant
Amazon UK Services / Push Energy
Location
Dc1, Boscombe Road, Dunstable, Bedfordshire, Bedfordshire, LU5 4RW, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/18/02801/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 29 August 2018 Planning application submitted
  • 24 October 2021 Planning permission expired

None found. The register holds no published incident that names Dc1 Boscombe Road. If you know of one, report it (confidential reports are anonymised).

The register holds 14 incidents at battery storage sites in the United Kingdom, 9 of them fires, and 177 worldwide. Counts of incidents in published reporting, not rates.

What fails at battery storage sites · All battery storage incidents

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.