Unit B, Chiltern Park Industrial Estate - Solar Panels

Operator Fine Foods International Manufacturing Limited

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 18 October 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Unit B, Chiltern Park Industrial Estate - Solar Panels is a 0.4 MW solar farm in Dunstable, Bedfordshire, United Kingdom. Its planning application (CB/21/00157/PASP) went to Central Bedfordshire on 21 January 2021 and was granted on 16 March 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 58 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Unit B, Chiltern Park Industrial Estate - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1493, Solar panels catch fire on Bedford warehouse roof, 29 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14932026Solar panels catch fire on Bedford warehouse roof29 kmMinor
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End36 kmMinor
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected39 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Fine Foods International Manufacturing Limited
Location
Unit B, Chiltern Park Industrial Estate, Boscombe Road, Dunstable, Bedfordshire, LU5 4LT, United Kingdom
Planning authority
Central Bedfordshire
Planning application
CB/21/00157/PASP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CB/21/00157/PASP, with what the planning evidence pack adds for this site.

Every application in Central Bedfordshire · Alerts for applications and incidents near here

  • 21 January 2021 Planning application submitted
  • 16 March 2021 Planning permission granted

None found. The register holds no published incident that names Unit B, Chiltern Park Industrial Estate - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Unit B, Chiltern Park Industrial Estate - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Unit B, Chiltern Park Industrial Estate - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Unit B, Chiltern Park Industrial Estate - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 18 October 2022.
Where is Unit B, Chiltern Park Industrial Estate - Solar Panels?
In Dunstable, Bedfordshire, United Kingdom (postcode LU5 4LT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).