Solar · United Kingdom
Unit DC1 Prologis
Operator Solar Sense
Abandoned1.1 MWData checked 16 November 2026Source record dated 27 September 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Unit DC1 Prologis is a 1.1 MW solar farm in Dunstable, Bedfordshire, United Kingdom. Its planning application (CB/15/03890/LDON) went to Central Bedfordshire on 10 July 2015 and was granted on 15 October 2015. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 59 other energy sites within 10 km, 34 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Unit DC1 Prologis changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 1.1 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Abandoned
- Operator or applicant
- Solar Sense
- Location
- Unit DC1 Prologis, Boscombe Road, Dunstable, Bedfordshire, LU5 4FA, United Kingdom
- Planning authority
- Central Bedfordshire
- Planning application
- CB/15/03890/LDON
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for CB/15/03890/LDON, with what the planning evidence pack adds for this site.
Every application in Central Bedfordshire · Alerts for applications and incidents near here
Timeline
- 10 July 2015 Planning application submitted
- 15 October 2015 Planning permission granted
- 15 October 2018 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Unit DC1 Prologis. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Unit DC1 Prologis had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Unit DC1 Prologis; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Unit DC1 Prologis?
- Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 27 September 2018.
- Where is Unit DC1 Prologis?
- In Dunstable, Bedfordshire, United Kingdom (postcode LU5 4FA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).