← Back to Angus
Planning pack for this site, £295Other options

Solar · United Kingdom

Baker Hughes, Charleton Road - Solar Panels

Operator eEnergy Group PLC

Awaiting Construction0.7 MWData checked 16 November 2026Source record dated 19 May 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Baker Hughes, Charleton Road - Solar Panels is a 0.7 MW solar farm in Montrose, Angus, United Kingdom. Its planning application (26/00056/CLU) went to Angus on 17 March 2026 and was granted on 3 April 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 12 other energy sites within 10 km, 4 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

EENERGY GROUP PLC (05357433), active, since 2005. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Baker Hughes, Charleton Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 29 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14762026House fire reported to have started on solar panels in Carnoustie29 kmSignificant
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline95 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School146 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
eEnergy Group PLC
Location
Baker Hughes Charleton Road, Angus, DD10 9EB, United Kingdom
Planning authority
Angus
Planning application
26/00056/CLU

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/00056/CLU, with what the planning evidence pack adds for this site.

Every application in Angus · Alerts for applications and incidents near here

  • 17 March 2026 Planning application submitted
  • 3 April 2026 Planning permission granted

None found. The register holds no published incident that names Baker Hughes, Charleton Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Baker Hughes, Charleton Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Baker Hughes, Charleton Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Baker Hughes, Charleton Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 May 2026.
Where is Baker Hughes, Charleton Road - Solar Panels?
In Montrose, Angus, United Kingdom (postcode DD10 9EB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).