Battery storage · United Kingdom
East Ballochy
Operator ScottishPower Renewables · Owner Scottishpower Renewable Energy Limited
Awaiting Construction10 MWData checked 16 November 2026Source record dated 15 September 2020
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
East Ballochy is a 10 MW battery storage site 5.5 km north-west of Montrose, Angus, United Kingdom. Its planning application (20/00019/FULM) went to Angus on 27 January 2020 and was granted on 15 September 2020. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 17 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when East Ballochy changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
SCOTTISHPOWER RENEWABLES (UK) LIMITED (NI028425), active, since 1994. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for East Ballochy sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 374 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 374 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 413 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 561 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Capacity
- 10 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- ScottishPower Renewables
- Owner
- Scottishpower Renewable Energy Limited
- Location
- Field 400M SE Of East Ballochy, East Ballochy, Montrose, Tayside, Angus, DD10 9LP, United Kingdom
- Planning authority
- Angus
- Planning application
- 20/00019/FULM
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 20/00019/FULM, with what the planning evidence pack adds for this site.
Every application in Angus · Alerts for applications and incidents near here
Timeline
- 27 January 2020 Planning application submitted
- 15 September 2020 Planning permission granted
- 15 September 2023 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names East Ballochy. If you know of one, report it (confidential reports are anonymised).
Questions
- Has East Ballochy had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names East Ballochy; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of East Ballochy?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 15 September 2020.
- Where is East Ballochy?
- 5.5 km north-west of Montrose, Angus, United Kingdom (postcode DD10 9LP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).